GP22006 - UNSW H13 GF & D26
Son Bültenler
  • 24th Ağustos 2021, COVID-19 Requirements

    In order to comply with the NSW Public Health Order restrictions outlined below, Graphite will be recording the vaccination and testing status for project purposes.

    a) Covid-19 vaccination evidence – workers to add their vaccination status at the time of Hammertech registration (similar to adding an ID or a White Card)
    b) All Admin Nominated representatives have the ability to update the Vaccination status of all workers when logged in to Hammertech.
    c) Covid-19 testing status and evidence – at the time of signing of the daily Sign in register ON SITE

    A person who lives in LGA of concern area must not enter a construction site in Greater Sydney unless:
    - The person has had 2 doses of the vaccine, or
    - Had one dose at least 21 days ago, or
    - Had one dose less than 21 days ago and has been tested for COVID within the preceding 72 hours (excluding workers from the Canterbury-Bankstown, Cumberland and Fairfield LGAs), or
    - Has a certified medical contraindication (being that a medical practitioner has certified, in a form approved by the CHO, that the person has a medical contraindication to the vaccine)

    The worker whose place of residence is in one of the declared areas must carry the required evidence when on a construction site and produce it on request to their employer, the occupier, a police officer or authorised officer.

    There is an obligation on the PCBU to ensure that the person has the required evidence
    - Proof of address, and
    At least one of the following:
    - Evidence from the Australian Immunisation Register that the person has had 1 or 2 doses of the vaccine
    - Evidence that the person has been tested for COVID-19
    - Medical certificate showing the medical contraindication

Saha Hava Durumu Tahmini
Geçerli Saha Hava Durumu

Hava Durumu Kullanılamaz


Gözlem kaynağı - Bureau of Meteorology
Gözlem Konumu - Sydney - Observatory Hill, NEW SOUTH WALES
Zaman Dilimi - Doğu Avustralya Standart Saati
Tahmin - Salı, 24 Şubat

Sunny morning. Shower or two.
Min: 22C Maks: 29C
Yağmur İhtimali: 60%
Beklenen Yağmur: 0 kime 6mm


Tahmin kaynağı - Bureau of Meteorology
Tahmin Konumu - Sydney, NEW SOUTH WALES
Zaman Dilimi - Doğu Avustralya Standart Saati
Yarın - Çarşamba, 25 Şubat

Shower or two.
Min: 20C Maks: 25C
Yağmur İhtimali: 70%
Beklenen Yağmur: 0 kime 8mm


Önemli Saha Belgeleri
  • HammerTech - Induction Steps (Shed Wall Poster) NEW

    Yüklenen 28.10.2024

    save_alt İndir
Sahada Yeni misiniz?

Bu sahanın KKD Gereksinimlerini biliyor musunuz?

Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.

Saha KKD Gereksinimlerini Görüntüle

Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.

Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.

Kayda Başla

Sahada Yeni misiniz?

Bu sahanın KKD Gereksinimlerini biliyor musunuz?

Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.

Saha KKD Gereksinimlerini Görüntüle

Sahada Yeni misiniz?

Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.

Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.

Kayda Başla

;