GP22006 - UNSW H13 GF & D26
Buletine recente
  • 24th august 2021, COVID-19 Requirements

    In order to comply with the NSW Public Health Order restrictions outlined below, Graphite will be recording the vaccination and testing status for project purposes.

    a) Covid-19 vaccination evidence – workers to add their vaccination status at the time of Hammertech registration (similar to adding an ID or a White Card)
    b) All Admin Nominated representatives have the ability to update the Vaccination status of all workers when logged in to Hammertech.
    c) Covid-19 testing status and evidence – at the time of signing of the daily Sign in register ON SITE

    A person who lives in LGA of concern area must not enter a construction site in Greater Sydney unless:
    - The person has had 2 doses of the vaccine, or
    - Had one dose at least 21 days ago, or
    - Had one dose less than 21 days ago and has been tested for COVID within the preceding 72 hours (excluding workers from the Canterbury-Bankstown, Cumberland and Fairfield LGAs), or
    - Has a certified medical contraindication (being that a medical practitioner has certified, in a form approved by the CHO, that the person has a medical contraindication to the vaccine)

    The worker whose place of residence is in one of the declared areas must carry the required evidence when on a construction site and produce it on request to their employer, the occupier, a police officer or authorised officer.

    There is an obligation on the PCBU to ensure that the person has the required evidence
    - Proof of address, and
    At least one of the following:
    - Evidence from the Australian Immunisation Register that the person has had 1 or 2 doses of the vaccine
    - Evidence that the person has been tested for COVID-19
    - Medical certificate showing the medical contraindication

Prognoza meteo șantier
Condiții meteo curente la șantier

Meteo nu este disponibil


Observație obținută de la - Bureau of Meteorology
Locație observație - Sydney - Observatory Hill, NEW SOUTH WALES
Fus orar - Ora standard a Australiei Orientale
Prognoză - marți, 24 februarie

Sunny morning. Shower or two.
Min: 22C Max: 29C
Șanse de ploaie: 60%
Precipitații așteptate: 0 la 6mm


Prognoză obținută de la - Bureau of Meteorology
Locație prognoză - Sydney, NEW SOUTH WALES
Fus orar - Ora standard a Australiei Orientale
Mâine - miercuri, 25 februarie

Shower or two.
Min: 20C Max: 25C
Șanse de ploaie: 70%
Precipitații așteptate: 0 la 8mm


Documente importante aferente locației
Nou în locație?

Cunoașteți cerințele EIP pentru acest șantier?

Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.

Vizualizare cerințele șantierului privind IPE

Începeți să lucrați mai devreme atunci când ajungeți în locație.

Finalizați înregistrarea la șantier online când doriți și economisiți timp.

Începeți înregistrarea

Nou în locație?

Cunoașteți cerințele EIP pentru acest șantier?

Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.

Vizualizare cerințele șantierului privind IPE

Nou în locație?

Începeți să lucrați mai devreme atunci când ajungeți în locație.

Finalizați înregistrarea la șantier online când doriți și economisiți timp.

Începeți înregistrarea

;